Pleasantview Community Association

Posted March 2006

01-The-bell-as-received 02-Disassembling 03-Sandblasting 04-Building-ringing-wheel 05-Fitting-ringing-wheel 06-Bell-carriage
01-The-bell-as-received.jpg 02-Disassembling.jpg 03-Sandblasting.jpg 04-Building-ringing-wheel.jpg 05-Fitting-ringing-wheel.jpg 06-Bell-carriage.jpg
07-Off-to-the-school 08-Assembling-at-school 09-Assembling-at-school 10-Assembled-at-school 11-Installation-crane 12-Setting-up
07-Off-to-the-school.jpg 08-Assembling-at-school.jpg 09-Assembling-at-school.jpg 10-Assembled-at-school.jpg 11-Installation-crane.jpg 12-Setting-up.jpg
13-Lifting 14-Lifting 15placing 16placing Finished-belfry  
13-Lifting.jpg 14-Lifting.jpg 15placing.jpg 16placing.jpg Finished-belfry.jpg

Return to Restoration Accomplished Page
Return to Photo Album Page